Episode 10 “Glimpse into making the Mare’s Leg Rig”

Video

Beaver News #12 – April 27, 2015

Episode 10 of the series “A Glimpse into making the Mare’s Leg Rig”

“last touches and quality control”

you see Mark putting the leg ties and hammer tab on and finishing up the holster and belt. There is a lot of TLC that goes in to everything we manufacture and before a product goes out the shop we do quality control.

 

Leave a Reply

Your email address will not be published. Required fields are marked *